East Elementary School

780-986-8421

  • The Gym Floor

    Posted on    Posted in Mr. Chomlak's Principal Messages

    Good day everyone,

    If you were not aware of it yet, our gym floor was removed this past month so that the concrete slab could be leveled and then a new floor would be installed.  Well, as with most renovation projects, there was an unexpected discovery that our concrete slab can not be mud-jacked effectively and will need to be replaced.  Thus, construction will continue for a while longer and this may push back the installation of the new gym floor into the middle of September.  The good news is that our staff and students have embraced spending more gym time in the great outdoors and we will continue to do this in the fall.  Thanks for your understanding, and wait until you see our awesome new floor!!

    Mr. Chomlak

    Our Stories